Friday, August 14, 2009

On The Job Photo Gallery: GSM: GLOBAL SYSTEM FOR MOBILE COMMUNICATIONS





Project: TEP 6 / Saudi Tel / MOPTT
Supply-Installation-Testing-Commissioning
GSM / MW Radios-Antennas-Transmission Cables
Kingdomwide: Saudi Arabia

Main Contractor To AT&T / Lucent
Co.: Haji Abdullah Alirezah Co. / Gentec Division
Kingdom of Saudi Arabia
In-Country Representative of Andrew Corporation


Training Certificate:
PCOM 23GHz & NERA 13/15 GHz MW Radio
Installation-Testing-Troubleshooting
Given By: Haji Abdulla Alirezah / GENTEC Div.
In Collaboration With Andrew Corporation
Given On: 16 July - 25 July 1996
Kingdom Of Saudi Arabia




ERECTION:
GSM Monopole Tower







Training Certificate:

GSM Transmission Lines & Antenna System
Rigging-Installation-Testing
Given By: Haji Abdullah Alirezah / GENTEC Division
In Collaboration With Andrew Corporation

30 May 1996 - 06 June 1996
Kingdom Of Saudi Arabia





Installation / Rigging:

GSM Transmission Cables & Antennas




























Installation / Rigging:

GSM Transmission Cables and Antenna








Training Certificate:

Heliax Training Course
Installing Connectors For MW Transmission Cable
Given by: Andrew Corporation (UK) / 29-31 May 1995



Installation:
GSM Transmission Cables, MW & GMS Antennas